Bioplex

To push forward Missouri S&T’s Bio-X initiative, wet bench research space suitable for molecular and cell biology projects is greatly needed. Current facilities on campus that can help meet this need are undersized, outdated and at capacity for  existing teaching and research activities in the life science fields. Planned renovations at Schrenk Hall will help to address the deficient quality of some of the existing research space, but will not be able to provide the additional square footage of
research space necessary to support growing research team sizes and additional principal investigators on campus. Likewise, as undergraduate enrollment in the life sciences increases teaching lab capacities will be exceeded in Schrenk Hall.

To address these issues, a program for the Bioplex has been developed to provide a significant amount of flexible wet bench laboratory space fitted out to support life science research. These research labs will be supported by the Center for Biomedical Research, which will be relocated and centralized to this building and serve as a core facility offering instrumentation support to the research teams both in the Bioplex and elsewhere on campus. A vivarium to complement the existing Schrenk West facility will also be provided, and expand the capabilities on campus with a design capable of ABSL2 containment.

Biology teaching labs will also be provided that will supplement the soon to be renovated teaching labs within Schrenk Hall, and accommodate the planned growth in enrollment and in course offerings. A small number of classrooms will be provided to aid in addressing campus wide projected growth in enrollment, encourage undergraduate traffic through the building, as well as provide a venue for some lectures and seminars to occur. An appropriate amount of student study, research exhibit, and collaborative space will also be provided for this facility.

Open image link Photo, Arrival District Completed
Bioplex Building in the Completed Arrival District

Executive Summary

The Bioplex is a planned new construction project to be located within the Arrival District, anchoring the south side of the Oval, immediately north of the James E. Bertelsmeyer Hall. The project represents Missouri S&T’s largest capital project ever; a research and education facility attracting exceptional faculty and students solving critical challenges at the intersection of engineering, medicine, and biology. The facility’s adjacency to both Bertelsmeyer Hall and Schrenk Hall will foster better collaboration between research faculty working within the chemical and biochemical engineering, chemistry, biological sciences, environmental science, and psychology programs.

With more than 20 faculty involved in medical or health-related research, S&T is positioned to have a significant impact on the future of medical research in a wide range of areas, including nano delivery of medicines for cancer and other diseases, systems engineering approaches to matching kidneys with transplant patients, biomaterials to speed the healing of open wounds and bones, and neuroscientific research to help diagnose Alzheimer’s disease. S&T has secured major support from the National Institutes of Health in recent years, with funding increasing from $280,000 in 2019 to over $2.5 million in 2023 and a projected growth to $15 million by 2030. All of this follows an investment of $45.8 million in capital construction and renovation projects on campus since 2014, including chemical and biological engineering and biological sciences facilities. An additional $28 million in planned renovations is to begin in fiscal year 2024.

S&T has secured major support from the National Institutes of Health in recent years, with funding increasing from $280,000 in 2019 to over $2.5 million in 2023 and a projected growth to $15 million by 2030. All of this follows an investment of $45.8 million in capital construction and renovation projects on campus since 2014, including chemical and biological engineering and biological sciences facilities. An additional $28 million in planned renovations is to begin in fiscal year 2024.

Building Concepts

Test Fit Plans

Open image link Bioplex Garden Level
Garden Level
Open image link
Level 1
Open image link Bioplex Level 2
Level 2
Open image link Bioplex Level 3
Level 3
Open image link Bioplex Site
Site Plan
Open image link Bioplex Landscaping
Landscaping Strategy
Open image link Bioplex Entry View
View of the East Entry
Open image link Bioplex View from the Innovation Lab
View from the Innovation Lab
Open image link Bioplex View from the Traffic Circle
View from the Tim Bradley Traffic Circle
Open image link Bioplex Interior View of Arrival District
Interior View of Arrival District

Teams & Committees

Steering Committee

Dr. Amy Belfi, Assoc Professor, Psychological Science
Dr. Anthony Convertine, Asst. Professor, Dept of Materials Science & Engineering Dr. David Duvernell, Professor & Chair of Biological Sciences
Dr. Yue-wern Huang, Professor of Biological Sciences & Assoc. Dean CASE
Dr. Steve Roberts, Vice Chancellor & COO Kummer College, Committee Chair Dr Risheng Wang, Assoc Professor, Chemistry Dept
Dr. Hu Yang, Professor & Dept Chair of Chemical & Biochemical Engineering

Design & Construction Management

Jonathan Garrett, S&T Director
Mike Peth, S&T Project Manager
Fred Stone, S&T Associate Vice Chancellor

Design Teams

ODIMO
Amy Slattery, Principal in Charge
Sean Slattery, Design Principal
Jeremy Nelson, Project Architect
Helen Trice, Designer

PGAV
Steve Cramer, Lead Programmer 
Tony Atchity, Lab Planner
James Ice, Designer 

MCCLURE ENGINEERING (MEP-FP)
Phil Wentz, Principal + Electrical Lead
Eric Poettker, Project Manager + Mechanical Lead

KPFF ENGINEERING (STRUCTURAL)
Marc Friedman Principal

SWT (LANDSCAPE)
Bonnie Roy, Partner
Wes Haid, Project Manager
Sam Wolkey, Designer 

ARCHER-ELGIN (CIVIL)
Cameron Schweiss

PROJECT ADVOCATES (COST)
Radd Way, Principal